/// WRK

Declassified operations

Selected engagements from the N94 archive. Some files remain sealed under client NDA; what follows is cleared for public release.

/// 01

Case Files

FILE-0094-A DEPLOYED

LOGISTICS GRID

Real-time fleet coordination MVP for a mid-size freight operator. Replaced a spreadsheet-and-phone-call workflow with a live dispatch board. First paying customer onboarded during week 7.

VUE 3 · PINIA · NODE.JS 6 WKS
FILE-0094-B VALIDATED

SIGNAL INTAKE

Proof of concept testing automated document triage for an insurance back office. Verdict: technically viable, 91% extraction accuracy on the pilot corpus. Green-lit for full build.

REACT · TYPESCRIPT · GRAPHQL 3 WKS
FILE-0094-C DEPLOYED

FOUNDRY OS

Internal production-planning MVP for a manufacturing group. Shipped with offline-tolerant data entry and a deploy pipeline the in-house team now operates without us.

VUE 3 · TYPESCRIPT · DOCKER 8 WKS
FILE-0094-D SEALED

PROJECT [REDACTED]

This file remains under active non-disclosure. Clearance level insufficient. Inquiries may be directed through official channels.

██████████ ██ WKS
///
Addendum

Detailed walkthroughs, architecture notes, and references are available on request under mutual NDA.

REQUEST FULL ARCHIVE →
///
Directive

Your project could be the next file.

Describe the objective. An engineer will return a substantive answer — scope, timeline, and a straight verdict — within 24 hours.

OPEN A CHANNEL →